Topography

Bathymetry
During a survey in 1981, the bathymetry of the estuary was established.  The estuary was relatively shallow, with the deepest measurement taken at 1km from the mouth, measuring 1,8m.  The water depth at the mouth was 0,6m at the time of the survey, on 1 December 1981 (Ref. 1).

Obstructions 

In 1981, a high concrete bridge crossed the Eerste River 3km from the mouth, carrying the road to the Macassar Sewage works, but this had sufficient clearance for minimal obstruction of floodwaters.  This bridge was beyond the observed limit of tidal penetration.  In 1981, a small temporary wooden bridge crossed the estuary channel near the observed tidal limit, 1,5km from the mouth.  As any major flood would carry this temporary crossing away it was not considered to be an obstruction (Ref. 1).

Outcrops of rocks from the Malmesbury Group near the sewage outfall in the channel are a natural obstruction and collect driftwood (Ref. 1).
In 1981 a short section of the fence on the west bank of the estuary, 900m from the mouth, at the boundary of the then Kentron controlled area, had flood debris adhering to it indicating some degree of obstruction (Ref. 1).
In 1981 the then Kentron boundary fence, embankment and road causeway on the east side of the estuary were a complete obstruction, totally isolating the wetland area, which was formerly the eastern area of the Eerste River estuary.
The Macassar Sewage Works has been constructed in part of the original estuarine flood plain (Ref. 1).